How This Calculation Works
The sod calculator multiplies the length and width of your lawn area to get the total square footage (or square metres). It then adds a waste percentage to cover trimming around curves, garden beds, walkways, and tree bases.
The result is converted to rolls (or pieces) and pallets. Standard sod rolls vary by region — in North America, a common size is 2 ft × 5 ft (10 ft² per piece). In metric regions, rolls are typically around 1 m². A full pallet covers approximately 500 ft² (50 m²), though this varies by farm.
For irregularly shaped lawns, break the area into rectangles and triangles, calculate each section separately, and add them together before entering the total into this calculator.
Common Mistakes to Avoid
- Ordering too little. Running short of sod means waiting for a second delivery — and the first batch may dry out or brown in the meantime. Always round up and add at least 5% waste.
- Not preparing the soil. Laying sod on compacted, weedy, or ungraded soil leads to poor root contact and patchy growth. Till, grade, and amend the soil before delivery day.
- Delaying installation. Sod is perishable. It should be laid within 24 hours of delivery (12 hours in hot weather). The rolls on the inside of a pallet can heat up and die quickly.
- Forgetting to water immediately. New sod needs heavy watering right after installation — enough to soak through the sod and 2–3 cm into the soil below. Continue daily watering for the first two weeks.
Worked Example
Scenario: A front lawn 10 m × 8 m with 5% waste for straight edges.
Step 1 — Area: 10 × 8 = 80 m².
Step 2 — With waste: 80 × 1.05 = 84 m².
Step 3 — Rolls: 84 ÷ 1 m² = 84 rolls (at ~1 m² per roll).
Step 4 — Pallets: 84 ÷ 50 = 1.68 pallets. Order 2 pallets (most farms sell full pallets).